Project Metrics

Status charts read the canonical Sphinx-Needs records on each documentation build. Counts describe recorded workflow status; they do not establish release readiness. See Project maturity for review history and verification context.

Requirement status

Status counts are calculated from the requirements on each documentation build.

Stakeholder requirements

Draft: 0 (0.0%); Reviewed: 0 (0.0%); Accepted: 65 (100.0%)

Total: 65

System requirements

Draft: 0 (0.0%); Reviewed: 0 (0.0%); Accepted: 11 (100.0%)

Total: 11

Software requirements

Draft: 0 (0.0%); Reviewed: 0 (0.0%); Accepted: 75 (100.0%)

Total: 75

Architecture element status

System elements

Draft: 0 (0.0%); Reviewed: 0 (0.0%); Accepted: 2 (100.0%)

Total: 2

Software elements

Draft: 0 (0.0%); Reviewed: 0 (0.0%); Accepted: 10 (100.0%)

Total: 10

Test-case maturity

Maturity describes review status (draft, reviewed, accepted), not execution outcome, pass rate or verification state. Populations use the canonical test_system and test_software tags, independently of requirement links.

System test cases

Draft: 3 (4.3%); Reviewed: 0 (0.0%); Accepted: 67 (95.7%)

Total: 70

Software test cases

Draft: 0 (0.0%); Reviewed: 0 (0.0%); Accepted: 56 (100.0%)

Total: 56

Scope management status

Problem tickets use their New / Analyzed / Fixed lifecycle. Change requests use their canonical Draft / Accepted / Implemented Need status. These lifecycles do not change requirement acceptance or verification results.

Problem tickets

New: 0 (0.0%); Analyzed: 1 (6.2%); Fixed: 15 (93.8%)

Total: 16

Change requests

Draft: 0 (0.0%); Accepted: 0 (0.0%); Implemented: 19 (100.0%)

Total: 19